About us Contact us Policies Returns In the news Tech help Pictures
Javascript Simple Menu by Vista-Buttons.com v4.3.0
Our Manufacturers
Diesel Care Inc
7265 Hwy 51 N
Millington, TN 38053



Toll 1.800.961.9290
Fax 1.901.873.1998
Loc 1.901.873.3400


Located just south of
I-385 on Hwy 51N
INSTALLATION INSTRUCTIONS – PMD RESISTOR

Installation of a PMD resistor is accomplished by first removing the old resistor from
the PMD. First remove the wiring harness to access the female pronged receptacle
on the PMD. Using an o-ring pick, gently insert the tip of the pick into one of the
outer holes in the resistor. Using slight force, angle the pick back and upward to
remove the resistor.

To install the new resistor, line up the notched area with the curvature of the
resistor and place it over the prongs. Using a small screw driver, gently force the
resistor down over the prongs until it bottoms out in the PMD. Slight force may be
needed to seat the resistor onto the prongs. Use caution not to bend any of the
prongs during removal on installation.

NOTE: The resistor will work in both the old style Stanadyne version of the PMD as
well as the new style updated PMD.